July installs are never easy. And this monster takes the cake! It took 3 days and LOTS of support staff to install a 15 Ton System to replace the existing unit at a Mesa retirement community Ballroom. Not just a pretty face, this massive system comes with a 2-stage cooling capacity control, allowing it to run at single stage for low loads and at full capacity for high loads. Impressive!